Blog

How do LNG fuel systems comply with the IGF Code?

Sep 24,2025

LNG fuel systems comply with the International Code of Safety for Ships using Gases or other Low-flashpoint Fuels (IGF Code) through a comprehensive approach to design, safety, and operational standards. The LNG Fuel Supply System (LFSS) must adhere to stringent requirements covering tank design, piping systems, safety mechanisms, and crew training. Double-walled tanks and piping prevent leaks, while advanced fire detection and suppression systems ensure rapid response to potential hazards. Ventilation systems in fuel preparation areas prevent gas accumulation, and emergency shutdown protocols swiftly isolate fuel sources in case of leaks. Additionally, the IGF Code mandates detailed risk assessments, specialized crew training, and structured bunkering procedures to safeguard the ship, crew, and environment. By meticulously following these guidelines, LNG fuel systems not only comply with the IGF Code but also contribute to the broader goal of sustainable and safe maritime operations.

LNG Fuel Supply System Innovative Design

Key IGF Code Requirements for LNG Fuel Systems

The IGF Code sets forth a comprehensive framework for the safe use of LNG as a marine fuel. Key requirements include:

Fuel Containment Systems

LNG fuel tanks of LNG Fuel Supply System must be designed to withstand the cryogenic temperatures of liquefied natural gas while maintaining structural integrity. The code specifies requirements for different tank types, including membrane tanks and independent tanks (Type A, B, and C). Each design must incorporate appropriate insulation and secondary barriers to prevent leakage.

Safety Systems and Equipment

The IGF Code mandates the installation of robust safety systems, including:

  • Gas detection equipment to monitor potential leaks
  • Fire detection and suppression systems designed for gas fires
  • Emergency shutdown systems to isolate fuel sources rapidly
  • Ventilation systems to prevent gas accumulation in enclosed spaces

Operational Procedures and Training

Compliance with the IGF Code extends beyond equipment to include operational aspects:

  • Detailed procedures for bunkering operations
  • Specialized training for crew members on LNG fuel system operation and safety
  • Regular drills and exercises to ensure preparedness for potential emergencies
  • Comprehensive documentation and record-keeping requirements

Design and Safety Features of Compliant LNG Systems

To meet IGF Code standards, LNG fuel systems incorporate several key design and safety features:

Double-Walled Piping and Tanks

A critical aspect of IGF Code compliance is the use of double-walled construction for both fuel tanks and piping systems. This design provides an additional layer of protection against leaks, with the space between walls often filled with inert gas or monitored for leaks. CM Energy's advanced LFSS designs incorporate state-of-the-art double-walled technology to ensure maximum safety and compliance.

Pressure Relief and Management

LNG systems must have robust pressure management capabilities to handle the natural boil-off gas (BOG) that occurs as LNG warms. This includes:

  • Pressure relief valves to prevent over-pressurization
  • BOG management systems, such as reliquefaction units or gas combustion units
  • Sophisticated control systems to monitor and manage tank pressure continuously

Advanced Control and Monitoring Systems

Modern LNG Fuel Supply Systems feature advanced control and monitoring capabilities:

  • Real-time monitoring of system parameters, including temperature, pressure, and flow rates
  • Automated safety systems that can initiate emergency procedures without human intervention
  • Integration with ship-wide safety and control systems for comprehensive vessel management

TSC's LFSS solutions incorporate cutting-edge control systems that not only ensure compliance but also optimize fuel efficiency and system performance.

Certification Process: Ensuring IGF Code Compliance

Achieving and maintaining IGF Code compliance involves a rigorous certification process:

Initial Design Review and Approval

Before construction begins, the LNG Fuel Supply System design must undergo a thorough review by classification societies and flag state authorities. This process includes:

  • Detailed analysis of system schematics and specifications
  • Review of risk assessments and safety studies
  • Verification that all components meet applicable standards and regulations

Construction and Installation Oversight

During the construction and installation phase, regular inspections and tests are conducted to ensure compliance with the approved design:

  • Material certifications and quality control checks
  • Pressure testing of tanks and piping systems
  • Functional testing of safety systems and control equipment

Commissioning and Operational Testing

Before a vessel with an LNG fuel system can enter service, it must undergo comprehensive commissioning and testing:

  • Full-scale testing of all system components and safety features
  • Simulated emergency scenarios to verify proper system response
  • Verification of crew competency in system operation and emergency procedures

TSC's experienced team provides comprehensive support throughout the certification process, ensuring smooth approval and commissioning of our LFSS solutions.

Ongoing Compliance and Inspections

Maintaining IGF Code compliance is an ongoing process that requires:

  • Regular inspections and surveys by classification societies
  • Periodic testing and calibration of safety systems
  • Continuous crew training and competency assessments
  • Proper maintenance and record-keeping of all LNG fuel system components

By adhering to these stringent design, safety, and certification requirements, modern LNG fuel systems not only comply with the IGF Code but also contribute to the broader goals of maritime safety and environmental protection. As the industry continues to evolve, companies like CM Energy remain at the forefront of developing innovative solutions that meet and exceed these critical standards.

Take the Next Step in LNG Fuel System Excellence

CM Energy, through our brand TSC, stands as a pioneer in LNG Fuel Supply System technology. As a leading LFSS supplier, our solutions not only meet IGF Code requirements but set new standards for efficiency and safety. With over a year of proven operational success, our low-pressure LNG systems offer unmatched reliability and performance. Experience the difference of a truly integrated LFSS solution, backed by our comprehensive design, manufacturing, and support services. Don't just comply – excel with CM Energy's cutting-edge LNG fuel systems.

Ready to elevate your vessel's LNG capabilities? Contact our expert team today at info.cn@cm-energy.com and discover how we can tailor our advanced LFSS solutions to your specific needs.

References

  1. International Maritime Organization. (2023). "International Code of Safety for Ships using Gases or other Low-flashpoint Fuels (IGF Code)." IMO Publishing.
  2. Lloyd's Register. (2022). "Guidelines for LNG Fuel System Design and Certification." Lloyd's Register Group Limited.
  3. American Bureau of Shipping. (2023). "Guide for LNG Fuel Ready Vessels and Barges." ABS Group.
  4. DNV GL. (2022). "Rules for Classification: Ships - Part 6 Chapter 2 Propulsion, Power Generation and Auxiliary Systems." DNV GL AS.
  5. Society of International Gas Tanker and Terminal Operators (SIGTTO). (2021). "LNG Bunkering Guidelines." SIGTTO.
  6. Maritime and Port Authority of Singapore. (2023). "Technical Reference for LNG Bunkering." MPA Singapore.
image